Toggle menu
English
Pic teaser__link highlighted

Rail

Hong Kong metro, SCL line, Hong Kong, China

A double feat to deliver two new tunnels for the Shatin to Central Link

Ten years after their first participation in the construction of the Hong Kong metro, VINCI Construction Grands Projets and Bachy Soletanche Group Limited are achieving a double technical feat in building the 12-kilometre SCL (Shatin to Central Link) line that connects the economic and commercial centre with the rest of the territory: construction of a 2.4-km tunnel by blasting and a 1.4-km twin bore tunnel by the 7.4-metre diameter Nu Wa earth pressure balanced shield tunnel boring machine, as well as associated shafts.

This website uses cookies. By continuing to browse this site, we will assume that you consent to the use of cookies. Find out more about cookies

I Accept